ZY6006火花試驗機
Spark tester
一、儀器圖示 Instrument graphic
二、使用范圍Using range
本試驗機適用于PVC、PE、硅膠、橡膠等電線之被覆的針孔檢查測試。使用于押出機生產線上檢驗或成品包裝過程之檢驗,符合GB/T3048、9-94、UL1581檢驗標準。
This machine is suitable for PVC, PE, silicone, rubber covering of a pinhole test of electric wire and so on. Used for extruding machine production line inspection and product packaging process of inspection, in line with the GB/T3048, 9-94, UL1581 testing standard.
三、性能參數 The performance parameters
2.1、該機包括高壓電源、試驗電、電壓表、擊穿報警及必要 的電氣設施和連接線。
2.2、靈敏度:在5KV,其火花間隙短路狀態下穩態電流≤60 μA;5KV被試驗線材與珠鏈間隙大于2.5mm以上,時間為0.15s時,可檢測出不良。
2.3、穩定性:在20次擊穿次數時為。
2.1, the machine including the high voltage power supply, breakdown alarm test electrode, voltmeter, and the necessary electrical facilities and cable.
2.2, sensitivity: in 5 kv, the spark gap acuities were 60 mu A steady state short circuit conditions current; 5 kv is test wire and bead chain gap is greater than 2.5 mm above, when time is 0.15 s, can detect the bad.
2.3, stability: when breakdown times 20 times.
四、安裝 The installation
1、 安裝時須將電槽推置于與被測電線成一直線,線16導輪溝底與電線接觸,調整螺桿使線在中心正確位置。
2、電線必須從珠鏈里穿過。
3、機殼外部必須用3.5mm2之導線與其它附屬設備之接地端子做良好接地施工17。
4、電槽內被測試之電線,所含水份必須以吹拭器用氣壓除濕。
1, when installation should be pushed electrode groove on with wire to be tested in a straight line, line 16 idler pulley groove and the contact wire, adjustment screw make the line in the center of the correct position.
2, the wire must be through the bead chain.
3, casing external must use was 3.5 wire and other accessory equipment grounding terminal to do well the construction of 17.
4, electrode wire slot under test, the water must be dry is used to blow air dehumidification.
五、操作 operation
本機安裝妥后須先裝1電槽之蓋閉后,使安全開關接觸,將計數器歸零,將7電源開關置于“ON”位,8指示燈亮,按下高壓
Shall be installed within the machine after installation completed 1 after the lid closed of electrode groove, make the safety switch contact, to the counter to zero and puts 7 power switch "ON" position, 8 indicator, press and high pressure
六、注意事項 Matters needing attention
1、 電箱1可與2本體分開安裝,但高壓引線必須使用高壓電線,不得使用同軸電纜。
2、 高壓引線須使用緣保護。
3、 本體必須與機器設備連鎖接地。
1, electrode box 1 and 2 ontology separately installed, but high-voltage fuses high-voltage wire must be used, coaxial cable shall not be used.
2, high voltage fuses shall be used for insulation protection.
3, ontology must chain with machinery and equipment grounding.
本頁產品地址:http://m.521uz.com/sell/show-4362570.html